Bible Title 1 2 3 4 5 more info
  • 98,000 seats; new press box suites and club level
  • Located in the heart of The Ohio State University campus, the historic stadium underwent complete renovation and made handicapped accessible
  • Locker room was completely renovated to hold the team in a single room
  • Completed in multiple phases over three off-seasons
  • Original design and character were preserved and improved upon during renovation
  • DesignGroup was a consultant to Osborn Engineering
  • Hocking Residence
  • Hocking Residence
  • Hocking Residence
  • Hocking Residence
  • Hocking Residence
Homepage » Our work » Education » stadium

© DesignGroup Columbus | Covington    mail@designgroup.us.com
515 E Main Street | Columbus OH 43215 | phone 614 255.0515 | fax 614 255.1515
27 West 7th Street | Covington KY 41011 | phone 859 431.7333 | fax 859 495.0859